A) discharge
B) valley slope
C) bed and side resistance
D) all of these
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) snow
B) hail
C) sleet
D) rainfall
Correct Answer
verified
Multiple Choice
A) non-regime section
B) inadequate slope
C) defective head regulator
D) all of these
Correct Answer
verified
Multiple Choice
A) side slope canal
B) contour canal
C) water shed canal
D) ridge canal
Correct Answer
verified
Multiple Choice
A) along the contact of the base profile of the apron with the sub-soil
B) in a straight path under the floor
C) in a straight path under the foundation work
D) none of the above
Correct Answer
verified
Multiple Choice
A) side slope canal
B) contour canal
C) ridge canal
D) all of these
Correct Answer
verified
Multiple Choice
A) at the head of the main canal
B) at the head of the water course
C) on the field
D) at all place
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) coefficient of creep
B) percolation coefficient
C) Lane's coefficient
D) none of these
Correct Answer
verified
Multiple Choice
A) water level in distributary
B) water level in water course
C) difference of water levels between distributary and water course
D) none of the above
Correct Answer
verified
Multiple Choice
A) aqueduct
B) super-passage
C) level crossing
D) canal syphon
Correct Answer
verified
Multiple Choice
A) free flooding
B) border flooding
C) check flooding
D) basin flooding
Correct Answer
verified
Multiple Choice
A) delta
B) duty
C) base period
D) crop period
Correct Answer
verified
Multiple Choice
A) meandering type
B) aggrading type
C) degrading type
D) all of these
Correct Answer
verified
Multiple Choice
A) rain gauge
B) osmoscope
C) turbidimeter
D) all of these
Correct Answer
verified
Multiple Choice
A) 1 to 1.2 m
B) 1.8 to 2 m
C) 2 to 2.5 m
D) 4 to 5 m
Correct Answer
verified
Multiple Choice
A) designing and construction of irrigation structures
B) designing and construction of bridges and culverts
C) flood control works
D) all of these
Correct Answer
verified
Multiple Choice
A) the process of artificially supplying water to soil for raising crops
B) a science of planning and designing an efficient and economic irrigation system
C) the engineering of controlling and harnessing the various natural sources of water, by the construction of dams, canals and finally distributing the water to the agricultural fields
D) all of the above
Correct Answer
verified
Multiple Choice
A) the field on the right side of canal
B) the field on the left side of the canal
C) the central half width of the section of the canal
D) any one of the above
Correct Answer
verified